Part 050 — Rollout and Rollback Operations

Tujuan

Rollout adalah momen ketika desired state berubah dan Kubernetes mulai mengganti runtime production. Di sinilah banyak incident muncul: image salah, config salah, secret stale, readiness gagal, connection spike, schema migration tidak kompatibel, atau traffic masuk ke pod yang belum benar-benar siap.

Rollback bukan sekadar menjalankan command. Rollback adalah keputusan operasional yang harus mempertimbangkan:

  • apakah versi sebelumnya masih kompatibel dengan database schema saat ini
  • apakah event/message sudah diproses oleh versi baru
  • apakah secret/config lama masih tersedia
  • apakah image lama masih bisa ditarik dari registry
  • apakah rollback menurunkan blast radius atau justru membuat data inconsistency

Part ini membahas rollout dan rollback dari sudut pandang backend service owner.


1. Rollout sebagai State Transition

Kubernetes Deployment melakukan perubahan melalui ReplicaSet baru.

flowchart LR A[Deployment Revision N] --> B[New Manifest Applied] B --> C[Deployment Revision N+1] C --> D[New ReplicaSet Created] D --> E[New Pods Scheduled] E --> F[Startup / Readiness] F --> G[Service Endpoint Updated] G --> H[Old Pods Scaled Down] H --> I[Revision N+1 Available]

Operationally, rollout bukan hanya kubectl apply. Rollout adalah sequence yang melewati scheduler, image pull, startup, readiness, service endpoint, traffic shifting, and old pod termination.


2. Rolling Update Basics

Contoh Deployment strategy:

strategy:
  type: RollingUpdate
  rollingUpdate:
    maxSurge: 1
    maxUnavailable: 0

maxSurge

Jumlah pod ekstra yang boleh dibuat di atas desired replica.

maxUnavailable

Jumlah pod yang boleh unavailable selama rollout.

Operational trade-off

SettingBenefitRisk
maxSurge: 1, maxUnavailable: 0availability lebih amanbutuh extra capacity
maxSurge: 25%, maxUnavailable: 25%rollout lebih cepatbisa mengurangi capacity saat rollout
maxUnavailable: 1 pada replica kecilsimplebisa outage jika hanya 1-2 replica
terlalu besar maxSurgerollout cepatconnection spike ke DB/broker/cache

Untuk backend Java service dengan connection pool besar, maxSurge dapat menaikkan koneksi ke PostgreSQL, Redis, Kafka, RabbitMQ, atau Camunda secara tiba-tiba.


3. Rollout Status Reading

Lihat deployment

kubectl get deploy <deployment> -n <namespace>

Perhatikan:

READY   UP-TO-DATE   AVAILABLE

Lihat rollout status

kubectl rollout status deploy/<deployment> -n <namespace>

Lihat revision history

kubectl rollout history deploy/<deployment> -n <namespace>

Lihat ReplicaSet

kubectl get rs -n <namespace> -l app=<app-name>

Lihat condition detail

kubectl describe deploy <deployment> -n <namespace>

Cari:

  • Progressing
  • Available
  • ProgressDeadlineExceeded
  • new ReplicaSet availability
  • old ReplicaSet scale-down

4. Rollout Health Signals

Rollout sehat jika:

  • image bisa dipull
  • pod scheduled
  • startup berhasil
  • readiness menjadi true
  • Service mendapatkan endpoint baru
  • error rate tidak naik
  • latency tidak naik tajam
  • dependency metrics stabil
  • logs tidak menunjukkan startup/runtime error
  • deployment marker muncul di dashboard
  • old pod termination berjalan graceful

Rollout tidak sehat jika:

  • pod stuck ImagePullBackOff
  • pod CrashLoopBackOff
  • readiness gagal
  • deployment ProgressDeadlineExceeded
  • new ReplicaSet tidak available
  • 5xx naik
  • latency naik
  • DB pool exhausted
  • Kafka/RabbitMQ consumer rebalance/redelivery spike
  • Camunda incidents naik
  • cache error meningkat

5. Post-Deployment Verification

Post-deployment verification harus membuktikan bahwa service tidak hanya running, tetapi benar-benar melayani traffic dengan benar.

Minimum verification

  • Deployment available
  • pods ready
  • service has endpoints
  • ingress route healthy
  • smoke test successful
  • error rate stable
  • p95/p99 latency stable
  • restart count stable
  • no new CrashLoopBackOff
  • dependency health stable
  • business-critical endpoint works

Backend-specific verification

Untuk JAX-RS API:

  • health endpoint ready
  • representative API returns expected status
  • auth/permission path works
  • timeout tidak berubah buruk
  • DB query path works

Untuk Kafka consumer:

  • consumer group stable
  • lag tidak naik abnormal
  • rebalance selesai
  • offset commit normal
  • DLQ tidak naik

Untuk RabbitMQ consumer:

  • consumer count normal
  • unacked tidak naik abnormal
  • redelivery tidak spike
  • DLQ normal

Untuk Camunda worker:

  • job activation normal
  • worker incidents tidak spike
  • timeout/retry normal
  • process correlation masih benar

6. Smoke Test Design

Smoke test bukan full regression test. Smoke test adalah minimal proof bahwa deployment bisa melayani jalur kritis.

Contoh smoke test API:

curl -fsS https://<host>/health/ready
curl -fsS https://<host>/api/quotes/<known-test-id>

Untuk service internal, smoke test bisa dilakukan melalui pipeline, synthetic monitor, atau controlled internal request.

Smoke test harus jelas

  • endpoint apa yang diuji
  • data apa yang aman digunakan
  • expected response apa
  • timeout berapa
  • environment apa
  • apakah test read-only atau write
  • apakah test meninggalkan side effect

Anti-pattern

  • smoke test yang selalu pass karena hanya cek /health/live
  • smoke test yang write data production tanpa cleanup
  • smoke test yang bypass ingress padahal masalah sering di ingress
  • smoke test yang tidak validasi dependency utama

7. Rollback Mental Model

Rollback Deployment mengembalikan pod template ke revision sebelumnya.

kubectl rollout undo deploy/<deployment> -n <namespace>

Tetapi rollback aplikasi tidak selalu mengembalikan seluruh sistem.

Rollback tidak otomatis mengembalikan:

  • database schema
  • migrated data
  • Kafka offsets
  • RabbitMQ messages already acked/nacked
  • Redis cache mutations
  • external API side effects
  • Camunda process state
  • secret rotation
  • config map external source

Karena itu, rollback harus dinilai sebagai mitigation, bukan magic reset.


8. Rollback Decision Matrix

SituationRollback likely safe?Notes
Bad image, app won't starttinggijika previous image masih ada
Bad config causing startup failuresedangmungkin fix config lebih cepat
Bad readiness pathtinggirollback bisa restore endpoint
Bad feature logic without data mutationsedang-tinggitergantung compatibility
Bad DB migration already appliedrendahbutuh migration strategy
Message consumer produced bad side effectsrendah-sedangperlu assess processed events
Secret rotation broke accesssedangbisa rollback config atau fix secret/IAM
Dependency outage unrelated to deployrendahrollback mungkin tidak membantu

9. Common Rollout Failure: Bad Image

Symptoms:

  • ImagePullBackOff
  • ErrImagePull
  • new ReplicaSet no pods ready
  • old pods may still serve traffic if maxUnavailable: 0

Safe investigation:

kubectl describe pod <pod> -n <namespace>
kubectl get deploy <deployment> -n <namespace> -o jsonpath='{.spec.template.spec.containers[*].image}'
kubectl rollout history deploy/<deployment> -n <namespace>

Mitigation:

  • rollback to previous revision
  • correct image reference through GitOps/pipeline
  • pause rollout if old pods still healthy

10. Common Rollout Failure: Bad Config

Symptoms:

  • CrashLoopBackOff
  • startup exception
  • missing environment variable
  • wrong endpoint URL
  • wrong feature flag
  • dependency connection failure

Failure path:

flowchart TD A[Config Change] --> B[New ReplicaSet] B --> C[Pod Starts] C --> D{Config valid?} D -->|No| E[Startup failure / CrashLoopBackOff] D -->|Partially| F[Pod Ready but Runtime Error] F --> G[5xx / latency / wrong behavior]

Mitigation options:

  • rollback deployment
  • revert config in GitOps
  • apply corrected config through approved pipeline
  • restart only if config reload requires it

Do not manually edit ConfigMap in production if GitOps will revert it or if audit process requires PR-based change.


11. Common Rollout Failure: Bad Secret

Symptoms:

  • authentication failure to DB/broker/cloud service
  • TLS handshake failure
  • startup fails because secret missing
  • pods ready but dependency calls return 401/403

Safe investigation:

  • confirm secret exists
  • confirm pod references expected secret name
  • confirm secret version/timestamp if available
  • confirm external secret sync status
  • inspect app logs without exposing secret value
  • check cloud IAM/secret access audit

Mitigation:

  • fix secret source
  • trigger external secret sync if approved
  • restart pod if secret only loaded at startup
  • rollback if previous deployment used compatible secret

Never paste secret values into incident notes.


12. Common Rollout Failure: Bad Migration

Migration failure is the most dangerous rollout class.

Problem

Application rollback may not undo schema/data migration.

flowchart LR A[Version N] --> B[Migration Applied] B --> C[Version N+1] C --> D[Bug Found] D --> E[Rollback to Version N] E --> F{Version N compatible with migrated schema?} F -->|Yes| G[Rollback safe] F -->|No| H[Rollback creates new incident]

Safer pattern

Use expand-contract:

  1. Expand schema backward-compatible
  2. Deploy app that can read/write both if needed
  3. Backfill/migrate data safely
  4. Switch reads/writes
  5. Contract old schema later

Rollback question

Before rollback, ask:

  • Did this release apply schema migration?
  • Is old version compatible with new schema?
  • Did new version write data in new format?
  • Are message/event formats backward compatible?
  • Is migration reversible?
  • Is there a database restore requirement?

13. Rollout Pause and Resume

Pause can be useful when rollout is partially progressed and more evidence is needed.

kubectl rollout pause deploy/<deployment> -n <namespace>

Resume:

kubectl rollout resume deploy/<deployment> -n <namespace>

Use pause when

  • error appears early but old pods still healthy
  • canary-like manual observation is needed
  • new pods are suspicious but not yet fully rolled out
  • platform/SRE needs time to inspect

Avoid pause when

  • deployment is already fully broken and mitigation is clear
  • pause leaves system with incompatible mixed versions
  • consumer workload mixed versions cause event format issues

14. Rollout and Dependency Pressure

Rolling update creates temporary overlap between old and new pods.

Impact examples:

  • PostgreSQL connections increase because old and new pods both hold pools
  • Kafka consumers rebalance repeatedly
  • RabbitMQ unacked messages spike during shutdown/startup
  • Redis connection count spikes
  • Camunda workers may activate jobs while old workers are terminating
  • external API rate limits can be hit

Review formula

max_possible_pods_during_rollout = replicas + maxSurge
max_possible_db_connections = max_possible_pods_during_rollout * pool_size_per_pod

This should be compared against DB/broker/cache capacity.


15. Graceful Shutdown During Rollout

Rollout safety depends on old pod termination.

Important pieces:

  • readiness flips false before termination
  • pod is removed from Service endpoints
  • app receives SIGTERM
  • app stops accepting new work
  • in-flight HTTP requests drain
  • Kafka/RabbitMQ/Camunda workers stop fetching new work
  • offsets/acks are handled safely
  • process exits before grace period ends
sequenceDiagram participant K as Kubernetes participant P as Pod participant S as Service EndpointSlice participant A as App K->>P: Termination starts P->>S: Readiness false / endpoint removal K->>A: SIGTERM A->>A: Stop accepting new work A->>A: Drain in-flight requests/messages A-->>K: Exit cleanly

If shutdown is not graceful, rollout itself can cause user-visible errors or duplicate processing.


16. GitOps-Aware Rollback

In GitOps environments, direct kubectl rollout undo may be temporary or overwritten.

Preferred rollback path usually:

  1. identify bad revision
  2. revert Git change or update desired image/config in Git
  3. let GitOps reconcile
  4. verify cluster state
  5. mark incident/release timeline

Emergency direct rollback may still be allowed under break-glass, but must be reconciled back into Git afterward.

Internal verification

  • Does internal process allow direct rollback?
  • Is rollback through GitOps required?
  • Who approves production rollback?
  • How is rollback communicated?
  • How are deployment markers created?

17. Rollout Debugging Flow

flowchart TD A[Deployment started] --> B[Check rollout status] B --> C{New pods created?} C -->|No| D[Check Deployment/ReplicaSet events] C -->|Yes| E{Pods running?} E -->|No| F[Check ImagePull / Pending / CrashLoop] E -->|Yes| G{Pods ready?} G -->|No| H[Check probes, logs, dependency startup] G -->|Yes| I{Traffic healthy?} I -->|No| J[Check ingress, service endpoint, logs, metrics, traces] I -->|Yes| K[Continue verification] F --> L{Rollback needed?} H --> L J --> L L -->|Yes| M[Rollback / revert through approved path] L -->|No| N[Fix forward / pause / monitor]

18. Production-Safe Commands

Read-only first

kubectl get deploy <deployment> -n <namespace>
kubectl describe deploy <deployment> -n <namespace>
kubectl rollout status deploy/<deployment> -n <namespace>
kubectl rollout history deploy/<deployment> -n <namespace>
kubectl get rs -n <namespace> -l app=<app-name>
kubectl get pod -n <namespace> -l app=<app-name> -o wide
kubectl describe pod <pod> -n <namespace>
kubectl logs <pod> -n <namespace> --previous

Potentially mutating commands

Use only when approved:

kubectl rollout pause deploy/<deployment> -n <namespace>
kubectl rollout resume deploy/<deployment> -n <namespace>
kubectl rollout undo deploy/<deployment> -n <namespace>
kubectl scale deploy/<deployment> -n <namespace> --replicas=<n>
kubectl rollout restart deploy/<deployment> -n <namespace>

In GitOps-managed clusters, prefer PR/revert unless incident procedure permits direct action.


19. When to Rollback

Rollback is usually justified when:

  • new release causes customer-visible outage
  • error rate/latency violates SLO after deployment
  • pods cannot become ready and previous version was healthy
  • clear correlation exists between deployment and incident
  • bad image/config/probe is detected
  • mitigation by fix-forward is slower or riskier

Be cautious when:

  • migration has changed schema/data
  • message/event format changed
  • rollback would create mixed-version incompatibility
  • dependency outage is unrelated to deployment
  • current version already processed irreversible side effects

20. When to Escalate

Escalate to platform/SRE when:

  • rollout failure caused by node capacity/autoscaler
  • ingress/controller issue is suspected
  • registry/IAM/network pull failure is cluster-wide
  • GitOps controller is unhealthy
  • PDB/node drain/upgrade conflict occurs
  • cluster event suggests platform component issue

Escalate to security when:

  • secret/identity/RBAC change is involved
  • credential rotation failed
  • unauthorized access or leakage is suspected
  • image vulnerability policy blocks release

Escalate to DBA/dependency owner when:

  • migration failed or partially applied
  • DB compatibility is uncertain
  • connection pool spike affects shared DB
  • Kafka/RabbitMQ/Redis/Camunda health is degraded

21. PR Review Checklist

Before approving rollout-related changes:

  • Deployment strategy appropriate for replica count
  • maxSurge and maxUnavailable safe
  • Readiness/liveness/startup probes correct
  • New image tag/digest explicit
  • ConfigMap/Secret changes reviewed
  • Migration compatibility assessed
  • Rollback path documented
  • Smoke test defined
  • Deployment markers available
  • Dashboard and alert coverage sufficient
  • HPA/PDB interaction understood
  • Dependency connection impact calculated
  • Message consumer shutdown behavior safe
  • GitOps rollback path clear

22. Internal Verification Checklist

Validate these in the internal team/platform context:

  • Standard rollout strategy for backend services
  • Default maxSurge/maxUnavailable
  • Who can trigger production rollout
  • Who can approve rollback
  • GitOps rollback procedure
  • Emergency direct rollback procedure
  • Deployment marker mechanism
  • Smoke test ownership
  • Post-deployment verification checklist
  • DB migration coordination process
  • Feature flag policy
  • Canary/blue-green availability
  • Rollback image retention policy
  • Incident communication channel
  • Runbook for bad deployment
  • Dashboard used during release window
  • Alert suppression or release annotation process

23. Key Takeaways

  • Rollout is a distributed runtime transition, not just a deploy command.
  • Rollback is mitigation, not guaranteed full reversal.
  • Bad image/config/secret/probe usually rollback cleanly; bad migration may not.
  • Post-deployment verification must include application, Kubernetes, ingress, dependency, and business-critical signals.
  • maxSurge and graceful shutdown directly affect dependency pressure and user-visible errors.
  • In GitOps environments, rollback should usually be expressed through Git unless break-glass procedure says otherwise.
Lesson Recap

You just completed lesson 50 in build core. Use the series map if you want to review the broader track, or continue directly into the next lesson while the context is still warm.

Continue The Track

Keep the momentum while the lesson is still fresh. Move backward for review or continue forward into the next concept.